Walker and Barnhart congratulated the team for their hard work and diligence in building and maintaining the wall through the entirety of the ongoing flood. Walker also vowed to have a new line painted between the 1973 and 1993 high water marks on Ardent Mill silo with the landmark ‘Welcome to Alton’ sign.